page-banner

Short Lead Time for 1.6mpa Brass Manifold - MANIFOLD-S5822 – Shangyi

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We now have a specialist, efficiency workforce to deliver excellent service for our purchaser. We always follow the tenet of customer-oriented, details-focused for Brass Fitting For Pex Pipe , Warmboard Alternatives Under Floor Heat , Bar Manifold , To significantly improve our service quality, our company imports a large number of foreign advanced devices. Welcome clients from home and abroad to call and inquire!
Short Lead Time for 1.6mpa Brass Manifold - MANIFOLD-S5822 – Shangyi Detail:

Brass manifold is made of forged brass and designed to distribute and recycle the water for drinking water, heating system, floor heatings and so on.

Product information :

Product name MANIFOLD
Sizes 1/4”-1/2″,3/4”
Bore Full bore
Application Water, oil, and other non-corrosive liquid
Working pressure PN16
Working temperature -10 to 110°C
Working durability 10,000 cycles
Quality standard EN13828, EN228-1/ ISO5208
End Connection BSP
Features: Heavy-duty design for higher pressure
Anti-blow-out stem structure/O-Ring or Pressure Nut
100% leakage test on valve before delivery
Agents wanted and OEM  acceptable
Packing Inner boxes in cartons, loaded in pallets
Customized design acceptable

Bore sizes for manifold:

SIZE 1216/1620(Weight) Carton
1″x3/4×2 1669 10
1″x3/4×3 2335 10
1″x3/4×4 3000 10
1″x3/4×5 3667 8
1″x3/4×6 4333 8
1″x3/4×7 4998 5
1″x3/4×8 5665 5
1″x3/4×9 6330 5
1″x3/4×10 6995 5

Production flow of manifold :

59534d14e21a7864798331 (1)

Brass material Chemical composition used for manifold:

59534d14e21a7864798331 (1)

Available surface treatments of manifold:

59534d14e21a7864798331 (1)

Packing of manifold:

59534d14e21a7864798331 (1)

Testing Lab for manifold:

59534d14e21a7864798331 (1)

Why choose SHANGYI as your China valves supplier:

1.rofessional valve manufacturer,with over 20 years of industry experiences.
2.Monthly production capacity of 1million sets,enables quick delivery
3.Testing each valve one by one
4.Intensive QC and on-time delivery,to make quality reliable and stable
5.Prompt responsive communications,from pre-sales to after-sales


Product detail pictures:

Short Lead Time for 1.6mpa Brass Manifold -
 MANIFOLD-S5822 – Shangyi detail pictures


Related Product Guide:

Gaining purchaser gratification is our company's aim eternally. We're going to make great initiatives to create new and top-quality products, satisfy your exclusive prerequisites and supply you with pre-sale, on-sale and after-sale solutions for Short Lead Time for 1.6mpa Brass Manifold - MANIFOLD-S5822 – Shangyi , The product will supply to all over the world, such as: Moscow , Peru , Brunei , We have more than 200 staff including experienced managers, creative designers, sophisticated engineers and skilled workers. Through hard work of all employees for the past 20 years own company grew stronger and stronger. We always apply the "client first" principle. We also always fulfill all contracts to the point and therefore enjoy excellent reputation and trust among our customers. You are very welcome to personally visit our company.We hope to start a business partnership on the basis of mutual benefit and successful development . For more information please do no hesitate to contact us..
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Colin Hazel from Oman - 2018.06.18 17:25
    This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Stephanie from Jamaica - 2018.07.26 16:51
    Write your message here and send it to us